Full fit out, bespoke joinery, flooring, decoration, mechanical and electrical, fittings and feature fittings, relocation, upcycling and installation of furniture.

Eastlake Group were appointed by the Glenmorangie Whisky Company to transform the 4th Floor of the prestigious 6 St Andrews Square into their new corporate headquarters.

As main contractor, Eastlake Group worked to deliver the project complete, within budget and ahead of schedule in close partnership with appointed architectural, project management and engineering firms.

Glenmorangie

Full fit out, bespoke joinery, flooring, decoration, mechanical and electrical, fittings and feature fittings, relocation, upcycling and installation of furniture.

Eastlake Group were appointed by the Glenmorangie Whisky Company to transform the 4th Floor of the prestigious 6 St Andrews Square into their new corporate headquarters.

As main contractor, Eastlake Group worked to deliver the project complete, within budget and ahead of schedule in close partnership with appointed architectural, project management and engineering firms.

Adapting The Existing

With a central focus of the project being sustainability, the project involved keeping as much of the existing internal architecture as possible, including internal partitions, electrical, lighting, fire suppression and air conditioning systems. All of these systems required large scale reconfiguration and adaptation to suit the new design.

With the very tight programme of works, this was a highly complex challenge which included the creation of a completely separate sub-tenancy space, with its own fully independent systems.

Upcycling & Refurbishment

The project is full of furniture that had reached the end of its normal lifespan, showing signs of age or wear and tear that we have given a second life through upcycling, refinishing and refurbishment.

These elements are particularly prevalent in the many meeting spaces throughout the space. With the reuse and repair of the existing table frames while modernising the finishes with new tops, updated power units and vinyl wrapping of credenza units to match in with the new finishes, the uplift is both environmentally responsible and seamlessly integrated.

Bespoke Manufacturing

This project had a large amount of bespoke joinery, from small scale bottle display units, to the stunning tasting bar and the nine meter whisky display wall.

As experts in bespoke joinery with our own carpentry and manufacturing division (Stag Developments), we worked closely with the project design team to identify and mitigate any possible complications with materials and construction in the design stages to ensure a stunning installation upon first-fit.

Having both main contractor works and bespoke joinery managed in-house ensured that both aspects were integrated seamlessly and proceeded in lock-step without miscommunications between trades.

The Perfect History

Eastlake Group, in partnership with its sister company Stag Developments, together have the perfect combined track record of delivering high end projects for both major corporations and the distillery sector.

By combining these sets of expertise, we were proud to deliver a project that combines the functional workings of a corporate headquarters with the premium brand identity and display features of a distillery.

“Over the course of a high pressure project with a very tight timelines, [Eastlake] were the ideal partner for us. They work with a team of specialists to deliver our new headquarters on time and within budget. They responded to our many tweaks throughout the build with patience and professionalism”

– Estates and Workplace, Customer Experience, The Glenmorangie Company.

“While the team at Stag demonstrated competence, attention to detail, and a commitment to quality throughout, it was their responsiveness to our needs and their professional approach to problem-solving that truly impressed. A pleasure to work with.”

– Lead Capital Project Manager, The Glenmorangie Company